News
News Releases
Advance Notice

Request More Info
Join our email list



Show printable version of 'Sultan Minerals Receives Encouraging Metallurgical...' in a New Window
 Wed Sep 20, 2006
Sultan Minerals Receives Encouraging Metallurgical Results For Jersey-Emerald Molybdenum

 Sultan Minerals Inc. (SUL - TSX-Venture) ("Sultan") is pleased to report that it has now received encouraging results from a preliminary Metallurgical Test for Molybdenum Flotation completed on a composite drill core sample from its Jersey-Emerald Property in southeastern British Columbia. The metallurgical study was completed by Process Research Associates Ltd. of Richmond, BC.

The metallurgical study blended core samples from four diamond drill holes into a single mineral composite which was then tested for molybdenum recovery by various flotation techniques. Although the main mineral of interest was molybdenite, the study found that many potential by-product recovery options should also be considered.

Rougher flotation recovered more than 97% of the contained molybdenum at a relatively coarse particle size (80% passing (P80) 170 um). The first rougher stage flotation recovered 98% of the contained molybdenum and 81% of the contained gold in 4.3% of the mass. The majority of the mass, 61.7%, was contributed by pyrite. Using lime as pyrite depressant in 5 stages of cleaning yielded a concentrate with grades of 29.2% molybdenum, 20.5% iron, 2.82g/T gold and 27.0g/T silver, with recoveries exceeding 47% gold and 95% molybdenum.

Mineralogical studies found that liberation was essentially 100% with the concentrate comprised of free grains of molybdenite (50% to 69%) and pyrite (28% to 45%) with traces (2.0%) of silicates, carbonate and rare chalcopyrite.

These preliminary results are encouraging and further testing is currently underway to improve the molybdenite and pyrite separation.

Sultan is currently in the process of completing a preliminary resource evaluation for the presently known tungsten and molybdenum mineralization on its Jersey-Emerald Property. The evaluation is incorporating the results of drilling completed by Sultan in 2005 and 2006 with historic drill results obtained by the previous mine operators. The study is expected to provide recommendations for further work that will lead to the preparation of a feasibility study. It is anticipated that the preliminary resource calculations will be completed by mid-October, 2006.

Arthur G. Troup, P.Eng., Geological
President and CEO

For further information please contact:
Investor Relations Tel: (604) 687-4622 Fax: (604) 687-4212
Marc Lee -- Email: mlee@sultanminerals.com or info@sultanminerals.com

No regulatory authority has approved or disapproved the information contained in this news release.
 
 

You can view the Next 2006 News Releases item: Mon Oct 2, 2006, Sultan Minerals Receives Report From BHP For Stephens Lake Nickel Property

You can view the Previous 2006 News Releases item: Tue Aug 8, 2006, Sultan Minerals Commences Resource Calculation On Its Tungsten-Molybdenum Project

You can return to the main 2006 News Releases page, or press the Back button on your browser.

Suite 500 - 666 Burrard Street Vancouver, British Columbia, Canada V6C 2X8   •  Tel 604-628-0519   •  Fax 604-628-0446